当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:of a 5.5 MW data center with EYP Mission Critical Facilities. This study concluded that energy savings of approximately 7 to 8 percent could be achieved over high-efficiency, best-practice 208 to 480 VAC with a 15 percent electrical facility capital cost savings, 33 percent space savings, and 200 percent reliability im是什么意思?

待解决 悬赏分:1 - 离问题结束还有
of a 5.5 MW data center with EYP Mission Critical Facilities. This study concluded that energy savings of approximately 7 to 8 percent could be achieved over high-efficiency, best-practice 208 to 480 VAC with a 15 percent electrical facility capital cost savings, 33 percent space savings, and 200 percent reliability im
问题补充:

  • 匿名
2013-05-23 12:21:38
与EYP任务关键设施一个5.5兆瓦的数据中心。
  • 匿名
2013-05-23 12:23:18
5.5兆瓦的数据中心与EYP关键设施。 这项研究的结论是,能源节省约7%至8%,就可以实现高效率、最佳实践208至480V交流,15%的电气设施节省资本成本,节省空间33%、200%的可靠性提高。
  • 匿名
2013-05-23 12:24:58
一个5.5兆瓦数据中心与EYP任务鉴定的设施。 这项研究认为,大约7%到8%节能可能达到在高效率,佳实践208到480 VAC以15%电子设施基建成本储款、33%空间节省和200%可靠性改善。
  • 匿名
2013-05-23 12:26:38
5.5 的 MW 数据中心与它特派团关键设施。这项研究的结论可以作到能源节省大约 7 到 8%的高效率,可靠性提高 200%,15%电力设备资本成本节约、 节省 33%的空间,与最佳做法 208 到 480 VAC。
  • 匿名
2013-05-23 12:28:18
一个一 5.5 MW 个数据中有 EYP 任务的中心重要设施。这项研究结束那能源储蓄大约 7% 到 8% 可以以 15% 在高效率,最好实践 208 至 480 VAC 期间被完成电设施首都节省成本, 33% 空间储蓄, 200% 可靠性改进。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭