求翻译:Strict engineering change and material substitution procedures: during the construction period, because of problems with the drawings, change of use or special material procurement difficulties such as design changes or replacement of material must with the consent of the design, construction, and supervision units, af是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Strict engineering change and material substitution procedures: during the construction period, because of problems with the drawings, change of use or special material procurement difficulties such as design changes or replacement of material must with the consent of the design, construction, and supervision units, af
问题补充:

  • 匿名
2013-05-23 12:21:38
严格工程变更和材料代用手续:因为问题的图纸在施工期间,使用或特殊材料采购困难,如设计变更或更换材料必须具有设计,施工,监理单位同意的变化,
  • 匿名
2013-05-23 12:23:18
严格的; 严谨的, 精确的; 严厉的; 完全的, 绝对的
  • 匿名
2013-05-23 12:24:58
Strict project change and material substitution procedure: Construction period, when firmly the blueprint existence question, the use change either the special acquisition of material difficulty and so on must carry on the design change or the material substitution, must get collect requisition the
  • 匿名
2013-05-23 12:26:38
严格的工程变更和材料替换程序: 在施工期间,由于问题与图纸,使用或特殊材料采购困难等的设计更改或更换材料的改变必须征得同意的设计、 施工和监理单位,得到改变,由本公司负责执法的现场技术书面通知技术部的书面的通知后任何人不得任意变更施工图纸及材料替代。
  • 匿名
2013-05-23 12:28:18
严格设计变化和材料替代程序:在建造时期期间,因为素描的问题使用或特别的材料获得困难的改变例如设计变化或材料的替代必须随着设计,建造,监督单位的同意,获取变化的书面通知后,通过一个书面通知的公司技术部门当场技术对强制执行负责,任何人不任意地将更改建造素描和材料替代。
 
 