当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:In the Disjoint Path (DP) scheme a completely protection disjoint path is associated to the working path (Fig.2b). The protection path is obtained by removing all the links crossed by the working path and calculating an alternative path in the new topology. The DP scheme offers a greater resource redundancy respect to 是什么意思?

待解决 悬赏分:1 - 离问题结束还有
In the Disjoint Path (DP) scheme a completely protection disjoint path is associated to the working path (Fig.2b). The protection path is obtained by removing all the links crossed by the working path and calculating an alternative path in the new topology. The DP scheme offers a greater resource redundancy respect to
问题补充:

  • 匿名
2013-05-23 12:21:38
在不相交路径(DP)的方案完全保护不相交路径相关联的工作路径(图2b) 。
  • 匿名
2013-05-23 12:23:18
在不相交路径(DP)计划完全保护不相交路径与工作路径(图2b)。 保护路径是通过去除所有获得的链接跨越了工作路径和备用路径计算在新的拓扑结构。 DP计划提供了一个更大的资源冗余的SLB计划,以保障同一数量的路径,但它是没有必要的信令系统,通知哪些链接失败。
  • 匿名
2013-05-23 12:24:58
在保护完全地 (弄乱) 道路的弄乱道路DP计划联系到运转的道路 (Fig.2b)。 保护道路通过去除运转的道路横渡的所有链接和计算一个供选择的道路在新的拓扑结构得到。 DP计划提供更加巨大的资源多余尊敬到SLB计划保护确切地通报道路的同一数量,但有信号系统是不必要的哪个链接发生了故障。
  • 匿名
2013-05-23 12:26:38
不相交路径 (DP) 方案中完全保护的不相交路径是与工作路径 (Fig.2b) 相关联。保护路径通过删除交叉的工作路径的所有链接和计算新的拓扑结构中的备用路径。DP 方案提供更多的资源冗余尊重 SLB 项计划,以保护相同数目的路径,但不是必须有一个通知到底哪个环节已经失败了的信号系统。
  • 匿名
2013-05-23 12:28:18
在使路径解体 (DP) 计划完全保护使路径解体被联系到工作路径 ( Fig.2b )。保护路径被撤销被工作路径越过,在新拓扑中计算一条供选择的路径的所有联系获取。DP 计划提供更大的资源多余尊敬到 SLB 计划保护路径的相同的数字,但是没必要有通知的一个标志着系统正好那联系失败了。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭