当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:对南池塘水库进行除险加固设计,其主要任务有对挡水建筑物、泄水建筑物、输水建筑物进行加固以及将防汛公路进行改造等内容是什么意思?

待解决 悬赏分:1 - 离问题结束还有
对南池塘水库进行除险加固设计,其主要任务有对挡水建筑物、泄水建筑物、输水建筑物进行加固以及将防汛公路进行改造等内容
问题补充:

  • 匿名
2013-05-23 12:21:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:23:18
正在翻译,请等待...
  • 匿名
2013-05-23 12:24:58
Carries on to the south pond reservoir eliminates the dangerous reinforcement design, its primary mission will have to keeps off the water building, the drainage building, the water distribution building carries on the reinforcement as well as guards against floods the road to carry on contents and
  • 匿名
2013-05-23 12:26:38
The South pond reservoir danger control and reinforcement design, its main tasks are to water retaining structure, spillway and water conveyance structure for reinforcement, as well as elements such as flood control and road reconstruction
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭