当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:Bidding of construction project is a key part of the bidding, it is a bid based on the tender side. Bidding is a process filled with uncertainty. The uncertainty of tender offer is affected by the size, complexity and technical content of the project. At the same time is restricted by time, resources and environmental 是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Bidding of construction project is a key part of the bidding, it is a bid based on the tender side. Bidding is a process filled with uncertainty. The uncertainty of tender offer is affected by the size, complexity and technical content of the project. At the same time is restricted by time, resources and environmental
问题补充:

  • 匿名
2013-05-23 12:21:38
建设工程招投标是投标的一个关键组成部分,它是基于投标方投标。
  • 匿名
2013-05-23 12:23:18
公开招标的建设项目是一个密钥的一部分的竞标,这是一个基于竞标的投标方。 招标投标是一个过程充满不确定性。 投标的不确定性是影响提供的大小、复杂性和技术含量的项目。 在同一时间,受时间、资源和环境因素。 本毕业设计课题是投标documents(commercial bid)幼稚园的项目。
  • 匿名
2013-05-23 12:24:58
出价建造计划是出价,它的一个关键部分是根据嫩边的出价。 出价是过程充满不确定性。 股权收购不确定性受项目的大小、复杂和技术内容的影响。 同时在时间、资源和环境因素以前制约。 这个毕业设计题目是出价的文件(出价的商务)幼稚园项目。 根据工程图,我们需要用途Glodon被加强的计数相当数量软件并且计数相当数量土木工程软件塑造,凹道各种各样的组分,并且增强,同一个形式与大厦图画,软件自动地计算数量。 然后进口价格软件以最后的总结,出口嫩报告并且格式化调整变动,并且与投标文件。
  • 匿名
2013-05-23 12:26:38
建设项目招投标是招投标的关键部分,它是基于招标方的出价。招投标是一个充满了不确定性的过程。投标报价的不确定性被受大小、 复杂程度和技术含量的项目。同时也被受时间、 资源和环境因素。本毕业设计题目是招投标 Documents(Commercial Bid) 的幼儿园项目。根据工程图纸,我们需要使用 Glodon 钢筋计数的数量的软件和计数土建工程软件建模的数额,绘制各种组件和加固,图纸的建筑物,该软件的相同表单自动计算数量。然后最后的总结与价格软件、 进出口评标报告和格式调整变化,以及与招标文件一样。
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭