当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:After the rail and tie blocks are accurately positioned for line and grade, concrete is placed under and around the tie blocks, partially embedding the tie blocks in the concrete.是什么意思?

待解决 悬赏分:1 - 离问题结束还有
After the rail and tie blocks are accurately positioned for line and grade, concrete is placed under and around the tie blocks, partially embedding the tie blocks in the concrete.
问题补充:

  • 匿名
2013-05-23 12:21:38
后导轨和领带块被精确地定位于线和等级,混凝土被置于和围绕领带块,部分地嵌入在混凝土领带块。
  • 匿名
2013-05-23 12:23:18
正在翻译,请等待...
  • 匿名
2013-05-23 12:24:58
After the rail and tie blocks are accurately positioned for line and grade, concrete is placed under and around the tie blocks, partially embedding the tie blocks in the concrete.
  • 匿名
2013-05-23 12:26:38
铁路和领带块可实现准确定位线与等级后,混凝土被放置下面和周围的领带块,部分将领带块嵌入混凝土中。
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭