当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:The approved design documents, construction drawings, metal structure design drawings and technical conditions, design amendment, manufacturers provide equipment installation instructions and the relevant technical documents; project contracting contract technical standards; construction period and try running period o是什么意思?

待解决 悬赏分:1 - 离问题结束还有
The approved design documents, construction drawings, metal structure design drawings and technical conditions, design amendment, manufacturers provide equipment installation instructions and the relevant technical documents; project contracting contract technical standards; construction period and try running period o
问题补充:

  • 匿名
2013-05-23 12:21:38
经批准的设计文件,施工图纸,金属结构设计图纸,技术条件,设计修改,制造商提供设备安装说明和有关技术文件;
  • 匿名
2013-05-23 12:23:18
经批准的设计文件、施工图纸、金属结构设计图纸和技术条件、设计修改、制造商提供设备安装说明和有关的技术文档;工程承包合同技术标准;施工期和试运行期间的测试和观察和分析结果
  • 匿名
2013-05-23 12:24:58
批准的设计文件、结构图、金属结构设计图和技术条件,设计校正,制造商提供安装设备指示和相关的技术文件; 项目收缩的合同技术标准; 基建期间和测试的尝试连续期间和观察和分析发生
  • 匿名
2013-05-23 12:26:38
批准的设计文件、 施工图纸、 金属结构设计图纸和技术的条件下,设计修订,制造商提供的设备安装说明和相关的技术文件 ;工程承包合同的技术标准 ;建设期和试运行期间的测试和观察和分析的结果
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭