当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:In to designs the firsthand information analysis in the foundation, unifies to the electrical power system electricity host wiring reliability, the efficiency and flexible and so on the basic request overall evaluation, in satisfies technical, under the economic policy premise, this design argues vigorously causes it t是什么意思?

待解决 悬赏分:1 - 离问题结束还有
In to designs the firsthand information analysis in the foundation, unifies to the electrical power system electricity host wiring reliability, the efficiency and flexible and so on the basic request overall evaluation, in satisfies technical, under the economic policy premise, this design argues vigorously causes it t
问题补充:

  • 匿名
2013-05-23 12:21:38
在在基础设计的第一手资料的分析,结合对电力系统的电力主接线可靠性,效率和灵活性等方面的基本要求全面评估,在满足技术,经济政策的前提下,这样的设计力争使
  • 匿名
2013-05-23 12:23:18
设计中的第一手资料中分析的基础,统一了对电源系统电主机连线可靠性、效率和灵活的态度,并因此在基本要求总的评价,在满足技术、经济政策的前提下,这种设计使其积极主张将成为技术进步可靠、发电、经济合理主线计划。
  • 匿名
2013-05-23 12:24:58
在对设计第一手信息分析在基础,成一体对电力系统电主人接线可靠性,效率和灵活等等基本请求总评估,满足技术,在经济政策前提之下,这个设计苍劲地争论起因它可靠地成为技术跃进,电力生产,经济合理的主要接线计划。
  • 匿名
2013-05-23 12:26:38
在设计的第一手资料分析基础上,结合电力系统电力主机接线的可靠性、 效率和灵活等等的基本要求整体评价,在满足技术、 经济政策的前提下,这种设计力争使它成为技术先进可靠、 发电、 经济合理的主接线方案。
  • 匿名
2013-05-23 12:28:18
在基础方面设计直接的信息分析,到电力系统电主人配线可靠性统一,效率和灵活等等基本请求总体评估,在满足技术,在经济政策假设下,这个设计有力地证明原因它可靠地成为技术进步,电一代,节约合理主要给人打电报计划。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭