当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:Project content and range: 2 complete power plants, one power plant is equipped with 32 common 2100kW diesel generating sets, another power plant is equipped with 16 common 2100kW diesel generating sets, 48 sets in total and total power is 100.8MW. Configuration of power plant also includes: transformer, set output bre是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Project content and range: 2 complete power plants, one power plant is equipped with 32 common 2100kW diesel generating sets, another power plant is equipped with 16 common 2100kW diesel generating sets, 48 sets in total and total power is 100.8MW. Configuration of power plant also includes: transformer, set output bre
问题补充:

  • 匿名
2013-05-23 12:21:38
Contenido del proyecto y rango: 2 plantas de energía completas , una planta de energía está equipado con 32 2100kW común grupos electrógenos diesel , otra planta de energía está equipado con 16 2100kW común grupos electrógenos diesel , 48 juegos en el poder total y el total es 100.8MW .
  • 匿名
2013-05-23 12:23:18
proyectar, planear; extrapolar, transcender, trascender; proyectarse, resaltar, sobresalir   proyecto, esquema, plan, tesina
  • 匿名
2013-05-23 12:24:58
正在翻译,请等待...
  • 匿名
2013-05-23 12:26:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭