当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:PI塗布后,到組合時間不可超過2小時,期間玻璃需放置在高效層流架內,如有超過2小時,必須重工是什么意思?

待解决 悬赏分:1 - 离问题结束还有
PI塗布后,到組合時間不可超過2小時,期間玻璃需放置在高效層流架內,如有超過2小時,必須重工
问题补充:

  • 匿名
2013-05-23 12:21:38
After the PI coating, to a combination of time not more than two hours , during the glass to be placed in a laminar flow and efficient aircraft , if more than two hours , must Heavy
  • 匿名
2013-05-23 12:23:18
PI 塗 cloth 后, the combination not more than two hours, during which time glass need to be placed in efficient laminar in this framework, if more than two hours, it must be heavy industry
  • 匿名
2013-05-23 12:24:58
After PI spreads the cloth, cannot surpass for 2 hours to the combination time, the period glass must lay aside in highly effective laminar, if has surpasses for 2 hours, must the heavy industry
  • 匿名
2013-05-23 12:26:38
PI coating, do not mix more than 2 hours, during the glass to be placed within the high performance laminar flow rack, if there is more than 2 hours, to heavy industry
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭