当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:When the power control algorithm is used to figure out the required power, the BTS modifies its transmission power based on this information. Once the BTS output power is changed, all the measured data and stored queues will be cleared and reset to receive new measurement reports for the next power control judgment pro是什么意思?

待解决 悬赏分:1 - 离问题结束还有
When the power control algorithm is used to figure out the required power, the BTS modifies its transmission power based on this information. Once the BTS output power is changed, all the measured data and stored queues will be cleared and reset to receive new measurement reports for the next power control judgment pro
问题补充:

  • 匿名
2013-05-23 12:21:38
当功率控制算法用于找出所需功率,在BTS修改其基于该信息的发送功率。
  • 匿名
2013-05-23 12:23:18
当功率控制算法用于计算出所需的电源,输血服务中心修改其传输电源根据此信息。 一旦BTS输出功率进行了更改,所有的测量数据和存储队列将被清除和重置为接收新的测量报告下一个电源控制判断过程。
  • 匿名
2013-05-23 12:24:58
当电能控制算法用于推测必需的力量时, BTS修改根据这信息的它的传输力量。 一旦改变BTS产品力量,将清除所有被测量的数据和被存放的队列和重新设置接受新的测量报告为下个电能控制评断过程。
  • 匿名
2013-05-23 12:26:38
当功率控制算法用来找出所需的功率时,输血服务中心修改其传播的力量,基于此信息。一旦 BTS 输出功率是改变了,所有的测量的数据和存储则会清除队列,并将重置为接收到新的测量报告,为未来电力控制判断过程。
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭