当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:After each time of power control, a few more measurement reports that still use the original transmission power or dynamically changing transmission power are likely to be received, but the level and quality information contained is inaccurate and should be ignored (other information, like adjacent cell information, is是什么意思?

待解决 悬赏分:1 - 离问题结束还有
After each time of power control, a few more measurement reports that still use the original transmission power or dynamically changing transmission power are likely to be received, but the level and quality information contained is inaccurate and should be ignored (other information, like adjacent cell information, is
问题补充:

  • 匿名
2013-05-23 12:21:38
功率控制的每次之后,仍然使用原来的发送功率或动态地改变发送功率的几个测量报告有可能被接收的,但包含在水平和质量信息是不准确的,应该被忽略(其它信息,如相邻小区
  • 匿名
2013-05-23 12:23:18
在每次的电源控制,一些更多的测量报告,仍然使用原始传动箱的动力或动态地改变传输可能会收到,但一级所载和高质量的信息是不准确的,应该被忽略(其他信息,如相邻的单元格信息,是否仍然有效.)因此,在下一个电源控制过程开始时,一些测量报告,还不够准确将被忽略。
  • 匿名
2013-05-23 12:24:58
以后每次电能控制,几更多测量报告仍然使用原始的传输力量或动力变化的传输力量可能被接受,但从容的水平和质量信息是不精确的,并且应该忽略 (其他信息,象毗邻细胞信息,是合法的。) 所以,在下个电能控制过程开始之前,不是足够准确的几个测量报告将被忽略。 使减到最小间隔时间downlink电能控制参量用于指定极小的间隔时间在二个电能控制过程之间。
  • 匿名
2013-05-23 12:26:38
经过每个时间的功率控制,仍然使用原来的传输功率或动态变化传输功率的几个更多的测量报告很可能要被接受,但包含的水平和质量的信息是不准确的并且应该忽略 (其他信息,如相邻的单元格中的信息,是仍然有效的)。因此,接下来的功率控制过程开始之前,几个不是足够精确的测量报告将被忽略。下行链路功率控制参数区间最小化用于指定最小时间间隔两个功率控制过程。
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭