当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:It is important that the traversability planner is robust to missing and some wrong cost estimates since the plan dictates if a site is reachable and will even be considered for landing. For instance, a skipped lidar packet at a pinch point will cause a hole in the terrain map making any other landing site inaccessible是什么意思?

待解决 悬赏分:1 - 离问题结束还有
It is important that the traversability planner is robust to missing and some wrong cost estimates since the plan dictates if a site is reachable and will even be considered for landing. For instance, a skipped lidar packet at a pinch point will cause a hole in the terrain map making any other landing site inaccessible
问题补充:

  • 匿名
2013-05-23 12:21:38
这是很重要的通行性策划师是稳健的失踪,一些错误的成本估算,因为该计划规定,如果一个网站是访问,并甚至会被认为是着陆。
  • 匿名
2013-05-23 12:23:18
重要的是,该计划是强大traversability失踪者和一些错误的成本估计自该《行动计划》规定如果一个站点被访问,甚至会被认为是降落。 例如,一个跳过激光雷达数据包在一个挤夹点会导致一个孔的地形地图中进行任何其他登陆站点无法访问。
  • 匿名
2013-05-23 12:24:58
它是重要的traversability计划者是健壮的到错过和一些错误成本估计,因为计划口授站点是否是可及的,并且为着陆甚而被考虑。 例如,一个跳的lidar小包在扭点在使其他着陆点的地形地图将导致一个孔不能进入。
  • 匿名
2013-05-23 12:26:38
它是很重要的首先进度表是失踪的鲁棒性和一些错误的成本估计,因为该计划规定一个站点是否可以到达,甚至会考虑着陆。例如,在夹点跳过激光雷达数据包将导致一个洞,在地形地图使任何其他登陆网站无法访问。
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭