当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:A. This project is based on the above floor of each layer of the beam plane diagram means;B. with the stude of leaving the ceiling embedded tendons, joints and stairs, doors and windows;C. construction basis, roof and column, must cooperate with electrical diagram, set lightning grounding system;The reliable measures d是什么意思?

待解决 悬赏分:1 - 离问题结束还有
A. This project is based on the above floor of each layer of the beam plane diagram means;B. with the stude of leaving the ceiling embedded tendons, joints and stairs, doors and windows;C. construction basis, roof and column, must cooperate with electrical diagram, set lightning grounding system;The reliable measures d
问题补充:

  • 匿名
2013-05-23 12:21:38
A.本项目是基于射束平面图的每一层的上述地板装置; b 。
  • 匿名
2013-05-23 12:23:18
正在翻译,请等待...
  • 匿名
2013-05-23 12:24:58
A. 这个项目根据射线飞机图手段的每层上述地板; B. 与stude离开天花板埋置了腱、联接和台阶、门和窗口; C. 建筑依据,屋顶和专栏,必须与电子图合作,设置了着陆系统的闪电; 可靠的措施在D.的建筑期间。 在cast-in-place平板应该采取保证位置准确性的上部并且降低酒吧。
  • 匿名
2013-05-23 12:26:38
答: 此项目根据上述地上的每一层的梁平面图手段 ;B.与离开在天花板上的学生嵌入肌腱、 关节和楼梯、 门和窗户 ;C.建设基础、 屋顶和列,必须配合电气图,设置防雷接地系统 ;D.施工的可靠措施应采取确保中现浇在就地板的上部和下部的栏的位置精度。
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭