当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:While uses the admixture frostproof measure, but also should strengthen the concrete the regeneration maintenance, to already outside the concrete surface and the template which constructs uses thermal insulation material covers and the package and so on crag cotton-wadded quilt, completes the regeneration heat preserv是什么意思?

待解决 悬赏分:1 - 离问题结束还有
While uses the admixture frostproof measure, but also should strengthen the concrete the regeneration maintenance, to already outside the concrete surface and the template which constructs uses thermal insulation material covers and the package and so on crag cotton-wadded quilt, completes the regeneration heat preserv
问题补充:

  • 匿名
2013-05-23 12:21:38
而使用外加剂防冻措施,但也应加强混凝土再生维修,已经到外面的混凝土表面和其构造模板使用保温材料覆盖和封装等岩棉被,完成再生保温
  • 匿名
2013-05-23 12:23:18
正在翻译,请等待...
  • 匿名
2013-05-23 12:24:58
当用途搀合物防冻措施,而且应该加强混凝土再生维护时,对已经在具体表面和修建用途绝热物质盖子和包裹等等碎片棉花wadded被子的模板之外,完成再生热保存工作,当必要应该密封地板时,用途温暖方法维护,保证结构混凝土质量。
  • 匿名
2013-05-23 12:26:38
虽然使用外加剂防冻措施,但还应加强混凝土再生维修,对混凝土表面外的模板,构建涵盖了保温隔热材料的用途已经和包等等峭壁棉被,完成再生热必要性应密封在地板上的保育工作,采用变暖方法维护,保证混凝土结构的质量。
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭