当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:Based on the building overall plane arrangement, the provincial level security civilized work site request, the construction location which the construction unit delimits, assigns the temporary water used, uses electricity, the draining water facility, the construction technical process and periphery establishments and是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Based on the building overall plane arrangement, the provincial level security civilized work site request, the construction location which the construction unit delimits, assigns the temporary water used, uses electricity, the draining water facility, the construction technical process and periphery establishments and
问题补充:

  • 匿名
2013-05-23 12:21:38
基于建筑物整体平面布置,省级文明安全工地要求,其中建设单位划定施工位置,分配使用的临时用水,用电,排水设施,施工工艺流程及周边设施等
  • 匿名
2013-05-23 12:23:18
根据建筑平面整体安排,省级安全文明工地要求,建筑的位置施工单位用于分隔,将临时用水、用电、用水设施的排放,建设技术过程和周边设施等工作条件。
  • 匿名
2013-05-23 12:24:58
凭大厦整体平面安排,省平实安全文明化了工作地点请求,建筑单位划定的建筑地点,分配使用的临时水,使用电,漏的供水系统,建筑技术过程,并且周围创立等等工作情况。
  • 匿名
2013-05-23 12:26:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭