当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:In order to ensure the quality of engineering contract grades; To ensure safety production, civilized construction to achieve standardization construction site; To ensure the construction period and delivery in advance. The project by having rich construction experience and management ability of the project manager as 是什么意思?

待解决 悬赏分:1 - 离问题结束还有
In order to ensure the quality of engineering contract grades; To ensure safety production, civilized construction to achieve standardization construction site; To ensure the construction period and delivery in advance. The project by having rich construction experience and management ability of the project manager as
问题补充:

  • 匿名
2013-05-23 12:21:38
为了确保工程承包的质量档次;
  • 匿名
2013-05-23 12:23:18
为了确保实现高质量的工程合同职系;确保安全生产、文明施工,实现标准化建设站点;确保施工期间和交付。 该项目有丰富的施工经验和管理能力的项目经理作为项目经理。
  • 匿名
2013-05-23 12:24:58
为了保证工程学合同等级的质量; 保证安全生产,文明的建筑达到标准化建造场所; 事先保证基建期间和交付。 项目由有项目负责人的富有的建筑经验和管理能力作为项目负责人。
  • 匿名
2013-05-23 12:26:38
为确保质量的工程合同的成绩 ;为了确保安全生产、 文明施工达到标准化施工现场 ;为确保建设期和提前交货。该项目由具有丰富的施工经验和管理能力的项目经理作为项目经理。
  • 匿名
2013-05-23 12:28:18
要确保设计合同的质量评级;要确保安全生产,使建造文明完成标准化建筑工地;要确保建造时期和发送提前。项目通过像项目经理一样有项目经理的富的建造经验和管理能力。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭