求翻译:This article provides cost engineers with a set of principles they can use to monitor and forecast engineering costs and the effect of scope and design changes on total project costs through the life of a project. Engineering costs, as defined herein, are intended to include project evaluations, basic data preparation,是什么意思?

待解决 悬赏分:1 - 离问题结束还有
This article provides cost engineers with a set of principles they can use to monitor and forecast engineering costs and the effect of scope and design changes on total project costs through the life of a project. Engineering costs, as defined herein, are intended to include project evaluations, basic data preparation,
问题补充:

  • 匿名
2013-05-23 12:21:38
本文提供的成本工程师提供了一套原则,他们可以用它来监控和预测工程成本和对项目总成本的范围和设计变更,通过一个项目的生命周期的影响。
  • 匿名
2013-05-23 12:23:18
这篇文章提供了成本工程师提供了一套原则,可以使用它来监视和预测工程成本和影响的范围和设计变化对项目费用总额在人的一生的一个项目。 工程成本,如本文档中所定义,目的都是要包括项目评估、基本的数据准备、范围定义、估算、规格、采购的设备制造和设计,和实际生产的设计图。
  • 匿名
2013-05-23 12:24:58
这篇文章提供他们在总项目费用可以使用通过项目的生活监测和展望工程学费用和范围和设计变动的作用的费用工程师以一套原则。 工程学费用,如此中被定义,意欲包括方案评估、基本数据准备,范围定义,估计,被制造的和设计的设备的规格、获得和设计图的实际产量。 范围控制和范围和设计变动的作用在总项目费用包括作为一个主要成本控制责任在项目的工程学和设计阶段期间。 一套成本工程学活动被推荐在每一五个阶段项目生活。 五个阶段是: 评估和计划; 基本的工程学; 详细的工程学; 建筑; 并且转交和设定。
  • 匿名
2013-05-23 12:26:38
这篇文章提供了一套原则,它们可以用于监视和预测工程成本和范围和设计变更影响的一生中一个项目的项目总成本的成本工程师。工程成本,如本文所定义打算包括项目评价、 基础数据准备、 范围定义、 估算、 规格、 编造和工程设备的采购和生产实际的设计图纸。在一个项目的工程和设计阶段还包括作为一项主要的成本控制责任范围控制和范围和设计变更对项目总费用的影响。成本工程活动的一整套建议为每个项目生命的五个阶段。五个阶段是: 评价与规划 ;基本的工程 ;详尽的工程 ;建设 ;营业额和设置。
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭