求翻译:Masonry must take embedded in the concrete tensile reinforcement in the wall, meet the specifications of the steel, spacing, length should comply with the design requirements. Hollow brick masonry with should be ahead of schedule 1 ~ 2 d water wet, the appropriate moisture content of 10% to 10%. The design rules of the是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Masonry must take embedded in the concrete tensile reinforcement in the wall, meet the specifications of the steel, spacing, length should comply with the design requirements. Hollow brick masonry with should be ahead of schedule 1 ~ 2 d water wet, the appropriate moisture content of 10% to 10%. The design rules of the
问题补充:

  • 匿名
2013-05-23 12:21:38
砌体必须采取嵌在墙上的混凝土受拉钢筋,满足钢铁,间距的规格,长度应符合设计要求。
  • 匿名
2013-05-23 12:23:18
砖石建筑必须采取嵌入式的具体抗拉加强在墙上,符合规范的钢、间距、长度应符合设计要求。 空心砖石结构,应提前1~2D水湿的,适当的湿度10%至10%。 的设计规则的口腔洞、管道、沟槽和嵌入式部分,预留了砌石墙和嵌入式零件,不应任意凿子构建的砖块或石块奠定良好的墙上。
  • 匿名
2013-05-23 12:24:58
石工在具体拉伸增强在墙壁必须采取埋置,符合钢的规格,间距,长度应该依从设计要求。 空心砖石工与应该是在日程表1 ~第2水湿,适当的湿气含量之前10%到10%。 洞、管道、凹线和嵌入零件的嘴的设计规则,将预留与石工墙壁和嵌入零件,不会任意地是凿是修造通过放置砖或石头好墙壁。
  • 匿名
2013-05-23 12:26:38
砌体必须采取嵌在混凝土受拉钢筋在墙上,满足规格的钢、 间距、 长度应符合设计要求。空心砌块砌体应尽量提前 1 ~ 2 d 水湿,适当的水分含量 10%至 10%。洞穴、 管道、 沟槽和预埋的件,要与砌体墙及预埋的件预留口的设计规则不应任意凿子是生成由砖砌体房屋或石头正常的墙。
  • 匿名
2013-05-23 12:28:18
石工在壁中在具体 tensile 增强中必须花嵌入式的,满足钢的规格,留间隔,长度应该遵守设计要求。空的砖块石工具提前应该是 1 ~ 2 d 水雨天,到 10% 的 10% 的适当的潮湿内容。山洞,管道,最佳状态和嵌入式部分的嘴的设计规则,石工墙被保留和嵌套部分,任意地将不是凿子是建造通过放砖块或石头好的墙。
 
 