当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:The project selection of PVC doors and Windows, doors and Windows made by the factory and shipped to the construction site, when the main construction, they must control the door hole sizes, this works all the jambs by prior reservation, after the installation of its mouth. Must be placed according to the specification是什么意思?

待解决 悬赏分:1 - 离问题结束还有
The project selection of PVC doors and Windows, doors and Windows made by the factory and shipped to the construction site, when the main construction, they must control the door hole sizes, this works all the jambs by prior reservation, after the installation of its mouth. Must be placed according to the specification
问题补充:

  • 匿名
2013-05-23 12:21:38
的塑钢门窗,门和由工厂生产,然后运到施工现场,当主体工程施工,就必须控制门洞尺寸的Windows项目选择,这一切工作的侧板事先预约,安装后它
  • 匿名
2013-05-23 12:23:18
该项目选择的PVC门窗、门和窗的工厂所作,运至施工现场,当主要的建筑,他们必须控制门孔尺寸,这样就可以通过所有的门框上提前预订,在安装后的嘴里。
  • 匿名
2013-05-23 12:24:58
PVC门的项目选择和窗口、门和窗口做由工厂和运输对建造场所,当主要建筑,他们必须控制门孔大小时,这运作所有门在预先的保留旁边,在它的嘴的设施以后。 必须根据规格安置在预制混凝土块石工砖墙固定帧,钻孔18cm在附近被安置在每50cm安置在第一个以后,在应该在窗口基石附近之后清洗设定结束和均匀地以层数硅树脂防水。
  • 匿名
2013-05-23 12:26:38
项目选择的 PVC 门窗、 门和窗户由工厂并运送到施工现场,当主体施工,他们必须控制门孔大小,这是所有子长事先预订,它的嘴在安装后通过。必须根据砌体砖壁固定的架的预制混凝土块、 孔 18 厘米在拐角处放置在后的第一个,放在窗台边,附近和均匀地有一层有机硅防水,应清理安装程序完成后每 50 厘米规格放。
  • 匿名
2013-05-23 12:28:18
PVC 门和 Windows 的项目选择,门和 Windows 使变得通过工厂和发货到建筑工地,当主要建造,他们必须控制门孔大小,这按以前保留操纵所有侧柱,在其嘴的安装之后。必须根据在石工砖墙中的规格被放置预制具体街区的固定框架, 18 厘米在附近的孔以设置结束后,在第一个之后被放置的每 50 厘米被放置应该环绕窗台被清理,平均以一层硅树脂防水。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭