当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:The reservation, buries the coordination in advance; The erection work personnel carries on the reservation according to the chart to bury, in advance the reservation does not have to damage at will, cuts off constructs the steel bar, when with construction structure contradiction, consults processing by the section ch是什么意思?

待解决 悬赏分:1 - 离问题结束还有
The reservation, buries the coordination in advance; The erection work personnel carries on the reservation according to the chart to bury, in advance the reservation does not have to damage at will, cuts off constructs the steel bar, when with construction structure contradiction, consults processing by the section ch
问题补充:

  • 匿名
2013-05-23 12:21:38
预约,预埋的协调;
  • 匿名
2013-05-23 12:23:18
正在翻译,请等待...
  • 匿名
2013-05-23 12:24:58
正在翻译,请等待...
  • 匿名
2013-05-23 12:26:38
预订,埋葬了协调提前 ;根据图表来埋葬预订架设工作人员进行,提前预订并没有损害将切断构造钢筋,用建筑结构矛盾时,咨询科科长和建设,在房子的错了,建筑地坪处理泄漏,堵塞,填充预埋管路安装,或设计增加了必须在不使在周围的房子来弥补建设理由埋、 墙上设备访问洞之后, 保持设计的确定和施工决定保持洞的建设。
  • 匿名
2013-05-23 12:28:18
保留,埋葬事先协调; 架设工作人员根据图继续保留埋没,保留事先不必须任意损坏,切除了修建铁棍,当以建筑结构矛盾,由部长时咨询处理,并且建筑,在大厦地面在房子错误附近,漏,中止,积土或设计增量,在墙壁保留不能在大厦地面前面做在房子附近组成埋葬,设备存取孔,在设计决心以后,并且决定的建筑由建筑保留孔的前管子设施。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭