当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:Implementation of the construction site temporary electrical safety technical specification and the construction site safety management regulations ", make safety electricity use of technical measures and electrical fire prevention measures, it is strictly prohibited to overload and does not conform to safety regulatio是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Implementation of the construction site temporary electrical safety technical specification and the construction site safety management regulations ", make safety electricity use of technical measures and electrical fire prevention measures, it is strictly prohibited to overload and does not conform to safety regulatio
问题补充:

  • 匿名
2013-05-23 12:21:38
施工现场临时用电安全技术规范和施工现场安全管理条例“ ,使安全用电技术措施和电气防火措施的执行情况,严禁超载和不符合安全规定的操作。在后
  • 匿名
2013-05-23 12:23:18
执行《施工现场临时用电安全技术规范》和《建筑地盘的安全管理条例”,使安全用电技术措施和电气防火措施,严禁超载和不符合安全规定的操作。 安装后的所有电源线路及设备,安全部门应检查并批准,合格后可以运行。
  • 匿名
2013-05-23 12:24:58
建造场所临时电子安全技术规格和建造场所安全管理章程的实施“做安全电用途技术措施和电子防火措施,它严密地被禁止超载和不依照安全章程为操作。 在所有输电线和设备的设施以后,安全部门将被检查并且被批准,并且具有资格的后方可以跑。
  • 匿名
2013-05-23 12:26:38
施工现场临时用电安全技术规范和建筑工地安全管理规定的执行情况",使安全用电的技术措施和电气火灾预防措施,它严禁超载和不符合安全操作规程。后所有的电力线路和设备的安装、 安全部门应当检查和批准,并可以运行合格的后方。
  • 匿名
2013-05-23 12:28:18
建筑工地的执行临时电安全技术规格和建筑工地安全管理规则,“做出安全电使用技术手段和电火防止中测量,它严格地被禁止使超载和不符合操作的安全规则。在所有电线和设备的安装之后,安全部门将被检查和批准,以及使后部具有资格可以被运行。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭