当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:The subcontract management of the fine decoration engineering and the multiple installation engineering. Due to the total contract in a number of work does not contain means will be more professional engineering by the owners of the prior contract, in construction with must be put in place to track, on the project qual是什么意思?

待解决 悬赏分:1 - 离问题结束还有
The subcontract management of the fine decoration engineering and the multiple installation engineering. Due to the total contract in a number of work does not contain means will be more professional engineering by the owners of the prior contract, in construction with must be put in place to track, on the project qual
问题补充:

  • 匿名
2013-05-23 12:21:38
精装修工程及多个安装工程的分包管理。
  • 匿名
2013-05-23 12:23:18
正在翻译,请等待...
  • 匿名
2013-05-23 12:24:58
美好的装饰工程学和多设施工程学的分包合同管理。 由于总合同在一定数量的工作在项目质量、全面控制进展、安全和它的监督和管理的整体建筑过程不包含手段是更加专业的工程学将由预先的合同的所有者,在建筑与必须放在适当的位置跟踪。
  • 匿名
2013-05-23 12:26:38
精装修工程和多个安装工程分包管理。由于大量的工作合同总不包含手段将更多的专业工程由业主事先合同,施工中必须放在地方要跟踪,对工程质量、 进度、 安全全面控制和其施工全过程的监督和管理。
  • 匿名
2013-05-23 12:28:18
好的装饰工程和多个安装工程的转包管理。由于总数的合同在一些工作不控制手段在建筑物中由以前合同的业主将是更专业设计具必须在合适的位置被存跟踪,在项目质量,进展,全面的控制和其监督和管理的整个建造过程的安全上。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭