当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:During the hydropower stage, the discharge of the reserved hole location can be arranged as soon as possible, and the whole piece of the pre embedding can be arranged as soon as possible.. Wall masonry basis drawings prior to the pipeline location reservation in place. Follow up the ceiling inside the pipe construction是什么意思?

待解决 悬赏分:1 - 离问题结束还有
During the hydropower stage, the discharge of the reserved hole location can be arranged as soon as possible, and the whole piece of the pre embedding can be arranged as soon as possible.. Wall masonry basis drawings prior to the pipeline location reservation in place. Follow up the ceiling inside the pipe construction
问题补充:

  • 匿名
2013-05-23 12:21:38
在水电阶段,预留孔位置的放电能尽快被布置,并且整片预嵌入的可尽快被布置..之前管道位置保留就位墙砌体基础附图。
  • 匿名
2013-05-23 12:23:18
水电阶段期间,排放的预留孔位置的可以尽快安排,整片前的嵌入可以尽快安排。 墙面砖石建筑图纸基础上前向该管道位置预留到位。 后续行动内的天花板的管道建设的模板在剥离后,请安装的管道中进行。
  • 匿名
2013-05-23 12:24:58
在水力发电阶段期间,尽职后备的孔地点可以尽快被安排,并且可以尽快安排前埋置的整体片断。 在管道地点保留之前到位围住石工依据图画。 在剥离以后接着天花板在管子建筑里面在模板,做设施到位事先用管道输送。
  • 匿名
2013-05-23 12:26:38
水电阶段预留的洞位置排放可以尽快为安排和预埋整块可以尽快安排。墙砌体基础图纸到位的管道位置保留之前。跟进内管施工模板中后剥离天花板,提前到位使管道安装中。
  • 匿名
2013-05-23 12:28:18
在水力发电阶段期间,保留的孔位置的释放可以尽可能很快被安排,以及整体块预嵌套可以尽可能很快被整理 .. 在管道位置预订之前的墙石工基础素描在合适的位置。脱光衣服后在模板中继续追踪在烟斗建造中的天花板,提前使管道系统的安装变得恰当。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭