求翻译:In order to ensure the achievement of quality objectives, prior to commencement of works should be developed, testing batches of each Division, engineering quality precontrol steps project involves the engineering, testing batches according to Engineering Division target decomposition, strengthen the control for constr是什么意思?

待解决 悬赏分:1 - 离问题结束还有
In order to ensure the achievement of quality objectives, prior to commencement of works should be developed, testing batches of each Division, engineering quality precontrol steps project involves the engineering, testing batches according to Engineering Division target decomposition, strengthen the control for constr
问题补充:

  • 匿名
2013-05-23 12:21:38
为了确保达到质量目标,开始应制定工作,测试每个事业部批之前,工程质量预控措施项目涉及的工程,测试批次根据工程部目标分解,加强施工过程控制,
  • 匿名
2013-05-23 12:23:18
为了确保实现质量目标,可在活动开始前的工程应在开发、测试批次的每一个司、工程质量预控步骤项目涉及的工程、测试批次工程部根据目标分解,加强建设过程的控制,以确保完成的工程质素。
  • 匿名
2013-05-23 12:24:58
为了应该开发在工作开工之前保证质量宗旨的成就,测试的批每分部,设计质量项目介入工程学的precontrol步,测试批根据工程部目标分解,加强控制为建筑过程,保证项目质量的完成。
  • 匿名
2013-05-23 12:26:38
以确保开发目标,工程动工前的,测试每个司的批次、 工程质量预控质量实现步骤项目涉及工程、 软件测试按照工程部目标分解,分批、 加强施工过程中,以确保完成项目质量的控制。
  • 匿名
2013-05-23 12:28:18
要在工作的开始应该被发展,测试每家公司的一批,设计高级控制前步骤之前,确保高级目标的成就项目根据工程公司目标分解含有设计,测验的一批,为建造过程加强控制,确保项目质量的完成。
 
 