当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:When measuring verticality, with vertical theodolite by the housing initial control line to test, in the construction, each layer are vertical parity deviation, and gradually layer correction, to prevent the resulting cumulative deviation, subject construction, four corners of each layer to measuring a perpendicularity是什么意思?

待解决 悬赏分:1 - 离问题结束还有
When measuring verticality, with vertical theodolite by the housing initial control line to test, in the construction, each layer are vertical parity deviation, and gradually layer correction, to prevent the resulting cumulative deviation, subject construction, four corners of each layer to measuring a perpendicularity
问题补充:

  • 匿名
2013-05-23 12:21:38
当测量垂直度,垂直经纬仪由外壳初始控制线进行测试,在施工中,每一层都垂直奇偶偏差,并渐层校正,以防止所产生的累积偏差,学科建设,四角各层来测量
  • 匿名
2013-05-23 12:23:18
悬垂测量时,垂直的经纬仪的房屋初始控制线测试,在建筑、每一层都是垂直奇偶校验偏差,逐步层纠错,以防止由此产生累积偏差,主题建筑,四个角落的每个图层的垂直度测量,以防止产生垂直偏差积累。
  • 匿名
2013-05-23 12:24:58
当测量的垂直性,与垂直的经纬仪由住房最初控制线路对测试,在建筑,每层数是垂直奇偶偏差和逐渐分层堆积更正,防止发生的渐增偏差,附属的建筑,每层的四个角落到测量perpendicularity防止产物垂直的偏差储积。
  • 匿名
2013-05-23 12:26:38
当与房屋初始控制线要测试,在施工中,每一层垂直经纬仪测量垂直度,垂直奇偶校验偏差,并且逐渐层校正,以防止由此产生的累积偏差、 学科建设、 四个角落的每一层测量垂直度,防止产生垂直偏差积累。
  • 匿名
2013-05-23 12:28:18
测量垂直性时,利用垂直 theodolite 在建造中,按检查的住宅群首字母控制线,每层是垂直对等偏离,逐渐地用压条法培值改正,防止发生累积偏离,隶属的建造,对于测量一个垂直性防止物产的每层的四个角落垂直偏离聚积物。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭