求翻译:Prior to pouring concrete, templates should be watered and humid, but mold cisterns, and collisions are not allowed when vibrated and embedded parts of steel and electricity pipelines, in order to ensure the quality of construction of impermeable concrete, the concrete free tilting height can not exceed 2m, when die-hi是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Prior to pouring concrete, templates should be watered and humid, but mold cisterns, and collisions are not allowed when vibrated and embedded parts of steel and electricity pipelines, in order to ensure the quality of construction of impermeable concrete, the concrete free tilting height can not exceed 2m, when die-hi
问题补充:

  • 匿名
2013-05-23 12:21:38
之前浇注混凝土,模板应浇水湿润,但模具蓄水池,和碰撞不允许振动和嵌入式钢和电力管道部件时,为了保证施工不渗透混凝土的质量,混凝土自由倾斜高度可以
  • 匿名
2013-05-23 12:23:18
在灌混凝土,模板应浇水湿润,但模具贮水器,和碰撞时不允许振动和嵌入式零件的钢和电力管道,以确保工程建设质量的防渗混凝土、混凝土、无倾斜高度不能超过2m,当芯片高串管、槽和其他小型切割自由落体海拔高度;
  • 匿名
2013-05-23 12:24:58
在倾吐的混凝土之前,模板应该是被浇灌的和潮湿,但模子储水池,并且碰撞不允许,当振动和钢和电管道的嵌入部分,为了保证不渗透性的混凝土的建筑的质量,具体自由掀动的高度不可能超出2m时,当死高串管,滑道和其他倾斜裁减自由秋天高度时;
  • 匿名
2013-05-23 12:26:38
在浇筑混凝土前模板应浇水和潮湿,但当振动时不允许模具水箱和碰撞和预埋的件的钢铁和电力的管道,以确保抗渗混凝土施工质量的混凝土自由倾斜高度不能超过 2 米,当模高弦管、 滑道和其他精益削减自由下落高度 ;
  • 匿名
2013-05-23 12:28:18
在倒混凝土之前,模板应该被喝水和潮湿,但是模子蓄水厢,碰撞在被振动和嵌套时不被允许钢和电管道的几个部分,以确保不能渗透的混凝土建造的质量,具体自由翘起高度不可以超过二百万,当死亡高的字符串管子,斜槽和其他倾斜度的削减自由下落高度;
 
 