求翻译:Scaffolding based completed Hou erection scaffolding, scaffolding of step from for 1.5M, away from ground 200mm at set size bar together, State Rod leading 1.5M, row from for 1.2m, column cross interval with different length of pipe, adjacent column of docking joints is located in different height Shang, scaffolding ov是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Scaffolding based completed Hou erection scaffolding, scaffolding of step from for 1.5M, away from ground 200mm at set size bar together, State Rod leading 1.5M, row from for 1.2m, column cross interval with different length of pipe, adjacent column of docking joints is located in different height Shang, scaffolding ov
问题补充:

  • 匿名
2013-05-23 12:21:38
基于脚手架后完成搭设脚手架,从1.5M为步脚手架,离地面200毫米在集大小酒吧起来,国家罗德领先的1.5M中,从1.2米行,列的交叉间隔与不同长度的管材,对接相邻列
  • 匿名
2013-05-23 12:23:18
侯孝贤的棚架搭建棚架,棚架的步骤从1.5m,远离地面200mm大小设置为在连在一起的酒吧、杆领先1.5m,从行为1M、列交叉间隔不同的长度的管道,相邻列的对接接头位于不同高度尚、棚架超过30m时,棚架底建立双列、双列旋转扣件连接形成整体的力量。
  • 匿名
2013-05-23 12:24:58
脚手架根据完整Hou架设脚手架,步脚手架从为1.5M,一起从地面200mm在集合大小酒吧,状态带领1.5M,列从为1.2m,专栏发怒间隔时间的标尺以管子的另外长度,相接联接的毗邻专栏位于另外高度Shang,脚手架30m Shi,脚手架底部建立了双重专栏,双重专栏与转动的扣片断连接整体上被形成的共同性由力量。 架设脚手架是第一个状态专栏,专栏架设第一个状态在旁边专栏, Hou状态外部旁边专栏,状态专栏Shi,做临时固定,架设大小酒吧, dang第一个部门大小酒吧架设完成的Hou,做再被修理的架设第二部门脚手架的专栏状态好Hou,当,在外部边的专栏提供地点实时性集合裁减力量括号时,裁减集合力量括号
  • 匿名
2013-05-23 12:26:38
脚手架基础完成侯架设脚手架,脚手架的 1.5 m,地面 200 毫米在集的大小酒吧在一起、 状态杆领先 1.5 m、 1.2 米,从行从步列交叉间隔与不同长度的管,相邻列的对接接头位于不同高度上,脚手架超过 30 万石、 脚手架底部建立双柱、 双柱具有旋转扣件连接形成整体共同武力。架设脚手架是第一个状态列,侯状态外侧栏侧栏列安装第一个状态状态列石,做临时固定,列状态好侯那个架设大小酒吧党第一部调整大小栏安装完成后,做固定再安装第二部脚手架,同时,在外侧的列中提供位置及时设置剪力撑剪的力支撑的设置应与脚手架的安装同步起来。
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 