求翻译:The time limit request tight. The total construction area of approximately 44261 square meters, including the construction of the whole project, to ensure that the project is completed through water, light, normal system working condition. Requirements in the 420 days are completed, in addition to increase the main pro是什么意思?

待解决 悬赏分:1 - 离问题结束还有
The time limit request tight. The total construction area of approximately 44261 square meters, including the construction of the whole project, to ensure that the project is completed through water, light, normal system working condition. Requirements in the 420 days are completed, in addition to increase the main pro
问题补充:

  • 匿名
2013-05-23 12:21:38
时限要求紧。
  • 匿名
2013-05-23 12:23:18
请求的时间限制严格。 建筑总面积约44261平方米,包括建筑的整个的项目,以确保项目完成后通过水、光、系统的正常工作状态。
  • 匿名
2013-05-23 12:24:58
紧紧期限请求。 总建筑面积的大约44261平方米,包括整体项目的建筑,保证项目通过水,光,正常系统工作环境完成。 要求在420天完成,除增量之外主要专业工程学资源 (人力,机械和原料流动) 输入,而且做所有技术准备,和在每一次级合同工作之间、所有者、监督、设计和相关部门、协调、通信和管理。
  • 匿名
2013-05-23 12:26:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:28:18
期限请求紧。大约 44261 平方米的总数的建造地区,包括整个项目的建造,确保项目通过水完成,操纵条件的轻,正常的系统。在 420 天的要求完成,除了增长主要专业设计资源 ( 人力,机器和物流 ) 输入,而且做所有技术筹备,在每份子合同之间工作,业主,监督,设计和相关部门,调和,通信和管理。
 
 