当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:All the local flat details pay off, the right angle method of measurement, measurement must be priority with the spindle, and the measurement line to and from the part of the. The pile axis protection along the foundation pit supporting lateral is conducive to the protection of the site layout of the control, the pile 是什么意思?

待解决 悬赏分:1 - 离问题结束还有
All the local flat details pay off, the right angle method of measurement, measurement must be priority with the spindle, and the measurement line to and from the part of the. The pile axis protection along the foundation pit supporting lateral is conducive to the protection of the site layout of the control, the pile
问题补充:

  • 匿名
2013-05-23 12:21:38
所有本地平细节还清,测量的直角方法,测量必须是优先与主轴,和测量线和从的部分。
  • 匿名
2013-05-23 12:23:18
所有的本单位详细信息支付关闭的时候,右角测量方法、测量必须优先与摘锭,其对应的测量线和一部分的。 这桩轴保护以及基坑的支助有助于横向的保护站点的布局的控制、桩位置必须挖掘400x400x300,C20普通混凝土填充、毛绒50x50木质十字条纹,Sesame指甲居中地标性建筑。
  • 匿名
2013-05-23 12:24:58
正在翻译,请等待...
  • 匿名
2013-05-23 12:26:38
所有本地的平细节还清,权利角度的测量方法,测量必须是优先事项与主轴旋转,并测量线与的一部分。沿地基基坑支护侧桩轴保护有利于保护站点布局的控制、 桩位置必须挖 400 x 400 x 300,灌装、 浇注 C20 素混凝土桩在 50 × 50 木交叉条纹、 芝麻钉为中心的标志性建筑。左右对围护结构女儿墙的轴控制。或在周围布设沉降已经稳定下来,清晰和易于保护本地、 引的一端和复制平到严格控制原理的后视高程,打算选择作为高程点站引周边永久道路,并经常检查。
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭