当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:Observation of main building subsidence in engineering strain measurement. Settlement observation by the construction unit to select qualified measurement unit measures and measurement results, timely feedback to the relevant personnel at the construction site, we will according to the actual situation at the scene acc是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Observation of main building subsidence in engineering strain measurement. Settlement observation by the construction unit to select qualified measurement unit measures and measurement results, timely feedback to the relevant personnel at the construction site, we will according to the actual situation at the scene acc
问题补充:

  • 匿名
2013-05-23 12:21:38
观察主要建筑物沉降工程应变测量。
  • 匿名
2013-05-23 12:23:18
观察主楼地面下陷的工程应力测量。
  • 匿名
2013-05-23 12:24:58
主要大厦沉淀的观察在工程学张力测量。 解决观察由选择的建筑单位合格了测量单位措施,并且测量结果,实时性反馈对相关的人员在建造场所,我们意志根据实际情况在场面根据得出解决观察布局设计的规格要求,对领带有监督,集合的解决观察的认同解决观察点,观察单位将准备项目计划。
  • 匿名
2013-05-23 12:26:38
主要建筑物工程应变测量中的沉降观察。沉降观测由施工单位,选择合格的测量单位度量值和测量结果,及时反馈给相关人员在施工现场,我们将根据实际情况在现场绘制沉降观察布局设计,以配合沉降观测的监督,批准的规范要求设置沉降观测点观察股将编写项目计划。
  • 匿名
2013-05-23 12:28:18
在设计类型测量方面的主要建造 subsidence 的观察。在选择有资格的测量单位的建造单位旁边的和解观察测量和尺寸的结果,适时的反馈到在建筑工地的相关的人员,我们希望根据实际处境在场景到领带,根据规格要求素描和解观察布局设计在以监督的和解观察的审批,设置和解观察指,观察单位将准备项目计划。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭