当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:According to the floor axis of the cushion, the accurate position of the cap and water collection is determined.. In the construction, it should be equipped with the quality control of the full-time measurement and laying line, the ash line in time, and the elevation of the excavation.. Artificial repair soil and excav是什么意思?

待解决 悬赏分:1 - 离问题结束还有
According to the floor axis of the cushion, the accurate position of the cap and water collection is determined.. In the construction, it should be equipped with the quality control of the full-time measurement and laying line, the ash line in time, and the elevation of the excavation.. Artificial repair soil and excav
问题补充:

  • 匿名
2013-05-23 12:21:38
根据缓冲垫的地板轴,盖和水收集的精确位置被确定。在施工,应当配备专职测量的质量控制和铺设线,在时间的灰线,
  • 匿名
2013-05-23 12:23:18
正在翻译,请等待...
  • 匿名
2013-05-23 12:24:58
根据坐垫的地板轴,盖帽的准确位置和水收藏是坚定的。 在建筑,应该装备它以全时测量的质量管理和挖掘的放置线、灰线及时和海拔。 模型系统,挖掘的部分的人为修理土壤和挖掘,在采纳合格以后,可能继续开掘,保证挖土的厚度。 大厦、路和房子监视在大厦的挖掘期间。 堆在挖掘严密地被禁止在碰撞期间。
  • 匿名
2013-05-23 12:26:38
根据地板垫层的轴,确定了帽和水收集的准确位置。在施工中,应配备专职测量和铺设线、 及时,火山灰线和开挖施工高程的质量控制。人工修复土壤和模型体系,对开挖,验收合格后的一段开挖可以继续挖,以确保土方开挖的厚度。建筑、 道路和房屋建筑的开挖过程中监测。桩严禁在开挖期间碰撞。
  • 匿名
2013-05-23 12:28:18
根据衬垫,帽子和水收集的准确的位置的地板轴被确定 .. 在建造中,它应该配备全职测量的质量管理和放线,灰线及时,以及挖掘的晋升 .. 人造维修土壤和模型系统的挖掘,一部分挖掘,在接受之后取得资格,可以继续挖掘,确保地球挖掘的厚度。在建筑物的挖掘期间的建筑物,路和房子的监测。堆严格地被禁止在挖掘中在碰撞期间。
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭