当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:This engineering basement earthwork excavation need to the surrounding enclosure, according to the design requirements do slope protection, specific measures to prepare a special construction program, approved by the supervision and approval before construction. When the basement is under construction, the main foundat是什么意思?

待解决 悬赏分:1 - 离问题结束还有
This engineering basement earthwork excavation need to the surrounding enclosure, according to the design requirements do slope protection, specific measures to prepare a special construction program, approved by the supervision and approval before construction. When the basement is under construction, the main foundat
问题补充:

  • 匿名
2013-05-23 12:21:38
此工程土方地下室开挖需要周围的外壳,根据设计要求做护坡,具体措施,准备了特殊的施工方案,经批准后方可施工监督和批准。
  • 匿名
2013-05-23 12:23:18
本工程地下室土方的挖掘需要机箱周围,根据设计要求进行斜坡保护,具体措施,准备建设一个特别方案,经监督和审批,然后再建设。 是时下的地下室建筑,主要是减少了基坑排水,防止排斥的地表水和雨水。
  • 匿名
2013-05-23 12:24:58
这工程学地下室土堤挖掘需要周围的封入物,根据设计要求倾斜保护,具体措施准备一个特用型式节目,批准由监督和认同在建筑之前。 当地下室是建设中时,减少主要基础坑,并且排水设备是: 防止水面和雨水排除。 在脱水主要作为的地下室基础坑在倾斜的底部,倾斜设计排水沟+很好设置在排水设备方式下然后朝向20米潜水的泵浦。 收集井的水主要位于基础坑的周围。 在地下室设置排水沟和废油坑附近。
  • 匿名
2013-05-23 12:26:38
这个工程的地下室土方开挖需要周围的外壳,根据设计要求做护坡,准备一个特殊施工程序,监督和批准施工前的批准的具体措施。当地下室正在施工时,减少了主要的基坑和排水系统: 为防止地表水和雨水排除在外。在地下室基坑降水主要采取底部的边坡,边坡设计排水沟渠 + 设置井下排水方式,然后头为 20 米的潜水泵。集水井的水主要位于基坑周边。周围的地下室设置排水沟和油底壳。
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭