求翻译:Beam and slab after pouring, construction joints with key-hole wire mesh or wood-mode blocked. When the pouring of post-pouring concrete, raise a grade of concrete and concrete mixing 15% UEA expansion agent of cement, allows it to produce micro-pressure offset the shrinkage and creep of concrete, temperature, tensile 是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Beam and slab after pouring, construction joints with key-hole wire mesh or wood-mode blocked. When the pouring of post-pouring concrete, raise a grade of concrete and concrete mixing 15% UEA expansion agent of cement, allows it to produce micro-pressure offset the shrinkage and creep of concrete, temperature, tensile
问题补充:

  • 匿名
2013-05-23 12:21:38
浇筑梁板后,用钥匙孔丝网或木模施工缝堵塞。
  • 匿名
2013-05-23 12:23:18
射束和带倒入后,建设部接头与密钥孔金属丝网或木质的模式被阻塞。
  • 匿名
2013-05-23 12:24:58
射线和平板在倾吐以后,建筑联接与匙孔铁丝网或木头方式阻拦了。 当倾吐岗位倾吐的混凝土,培养混合15% UEA水泥时的扩展代理具体和混凝土等级,允许它导致微压力抵销收缩,并且混凝土蠕动,温度,张应力,镇压在无混凝土结构,改进不渗透性。注意以后倾吐的带在射线的每一边和平板在倾吐入一个悬臂式结构的晚倾吐的带前面,并且假设不可能去除上部建筑装载,主要和次要大梁模板和支持,直到最后你完成倾吐。 必须由经理批准对撤除的技术经理认同。 最新铸件区域在,加强保护的倾吐以后,不少于14天的保护期间。
  • 匿名
2013-05-23 12:26:38
梁与楼板浇注后的,键孔的施工缝线网格或木模阻止。当浇筑后浇混凝土,提高等级的混凝土和水泥混凝土搅拌 15 %uea 膨胀剂的水泥,使它能够产生微压偏移收缩与徐变混凝土、 温度、 拉伸应力时,没有,混凝土结构裂缝的提高抗渗性能。注后浇带两侧的梁板坯在后期后浇带涌入悬臂梁结构,并将承担上部结构荷载,主要和次要梁模板及支撑不能删除,直到最后一个完成浇筑。去除技术经理审批必须由项目经理批准。后的浇带后倾泻而出,加强养护,养护时间不得少于 14 天。
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 