当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:This project mainly includes the wall, ceiling plaster leveling, plastering engineering, latex paint doors and windows and wall decoration.In the decoration in the construction process will be interspersed with hydropower installation, the construction of a number of sub project of the intelligent building, in order to是什么意思?

待解决 悬赏分:1 - 离问题结束还有
This project mainly includes the wall, ceiling plaster leveling, plastering engineering, latex paint doors and windows and wall decoration.In the decoration in the construction process will be interspersed with hydropower installation, the construction of a number of sub project of the intelligent building, in order to
问题补充:

  • 匿名
2013-05-23 12:21:38
该项目主要包括墙壁,天花板石膏找平,抹灰工程,乳胶漆门窗及墙体decoration.In在施工过程装修将与水电安装穿插,一些智能建筑的分项目的建设,
  • 匿名
2013-05-23 12:23:18
这么, 这样地   这; 今, 本; 这个
  • 匿名
2013-05-23 12:24:58
这个项目主要包括墙壁,天花板膏药成水平,涂灰泥工程学、乳胶漆门和窗口和墙壁装饰。在装饰在建筑过程将散置与水力发电设施,聪明的大厦的一定数量的次级项目的建筑,为了保证,保证期间完成整修工作,我们将仔细地组织涂灰泥,表面饰板,木头,油漆,天花板,并且各种各样专业队,合理散置与建筑,意志也给充分的戏剧作为一般承包商的管理和协调作用,因此每次级项目建筑顺利地执行了。
  • 匿名
2013-05-23 12:26:38
这个项目主要包括墙体、 天花板石膏找平、 抹灰工程、 乳胶漆门窗和墙上的装饰。在装修施工中的过程将被散置与水电安装、 建设一批子项目的智能化的建筑,以保证,保证工期完成翻新工作,我们将精心组织抹灰、 单板、 木做、 油漆、 天花板和各种专业的团队,合理穿插施工,也将充分发挥作为总承包商的管理和协调职能所以,每一个子项目建设顺利进行。
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭