当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:According to the design requirements, the project shall be carried out settlement observation of buildings. Datum points must be measured according to the construction of settlement observation in Foundation pit deformation measurement procedures related to provision of emplacement outside a stable, no fewer than three是什么意思?

待解决 悬赏分:1 - 离问题结束还有
According to the design requirements, the project shall be carried out settlement observation of buildings. Datum points must be measured according to the construction of settlement observation in Foundation pit deformation measurement procedures related to provision of emplacement outside a stable, no fewer than three
问题补充:

  • 匿名
2013-05-23 12:21:38
根据设计要求,该项目应进行沉降观测建筑物。
  • 匿名
2013-05-23 12:23:18
根据设计要求,该项目应进行沉降观测的楼宇。
  • 匿名
2013-05-23 12:24:58
正在翻译,请等待...
  • 匿名
2013-05-23 12:26:38
根据设计要求,该项目应进行沉降观测的建筑物。基准点必须衡量施工沉降观测在基坑变形测量程序相关条文以外的稳定,不少于 3 上午,进驻他们铺设的模式是指建筑测量基准点的基础沉降将按设计要求工作奠定变形测量过程中的模式奠定了,或根据规范奠定了近结构四个角落双方的后浇带和核心筒在墙上或列
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭