求翻译:Concrete pouring is complete, uniform environmental conditions conservation of concrete samples sent to the laboratory for testing of test report according to the laboratory's strength, decided the template removal time and measures. When stripping, stripping split should generally follow when first poured, first princ是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Concrete pouring is complete, uniform environmental conditions conservation of concrete samples sent to the laboratory for testing of test report according to the laboratory's strength, decided the template removal time and measures. When stripping, stripping split should generally follow when first poured, first princ
问题补充:

  • 匿名
2013-05-23 12:21:38
混凝土浇筑完成后,统一的环境条件下养护根据实验室的实力送往实验室进行测试报告的具体测试样本,决定模板拆除时间和措施。
  • 匿名
2013-05-23 12:23:18
具体投入完成后,统一环境条件的保护具体样本送至实验室进行测试的测试报告根据实验室的实力,决定了模板删除时间和措施。 当剥皮,剥皮拆分时请遵循以下一般来说不应倒第一,第一个原则。 射束和模板模板和设计的支持实现的混凝土强度,强度值才能将其删除。
  • 匿名
2013-05-23 12:24:58
具体倾吐是具体样品的完全,一致的环境状况保护寄发到实验室为测试实验报告根据实验室的力量,决定了模板撤除时间和措施。 当剥离时,剥离的分裂应该一般跟随,当首先倾吐,基本原理。 射线和板材支持模板和设计在具体力量的认识到力量价值,在可以取消之前它。 模板,列模式在倾吐出于模子12小时撤除
  • 匿名
2013-05-23 12:26:38
混凝土浇筑是完整的、 统一的环境条件下养护混凝土样品送往实验室进行测试的测试报告根据实验室的强度决定的模板删除时间和措施。当剥离,剥裂一般应遵循时第一次倒了,第一的原则。梁、 板的模板和设计支持实现混凝土强度对强度值之前它可以被删除。模板列模式在流泻出 12 小时拆模
  • 匿名
2013-05-23 12:28:18
倾泻的混凝土是完整的,为了根据实验室的力量测试报告的检查被传送实验室给的具体例子的统一环境条件保存,决定模板删除时间和手段。脱光衣服,夺去拆分时应该通常接踵而来首先什么时候倾泻首先向灌输。在具体力量的实现中的支持的横梁和盘子模板和设计到力量价值可以被撤销之前。Formwork,在模具的 12 小时的删除使的倾泻中的栏模式
 
 