当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:This company construct control characteristic is “the plan advance, the model leads the way”, this project will defer to the plan establishment plan, will formulate detailed, has pointed and the feasibility construction plan, thus will realize in the management level and the operation level to the construction craft, t是什么意思?

待解决 悬赏分:1 - 离问题结束还有
This company construct control characteristic is “the plan advance, the model leads the way”, this project will defer to the plan establishment plan, will formulate detailed, has pointed and the feasibility construction plan, thus will realize in the management level and the operation level to the construction craft, t
问题补充:

  • 匿名
2013-05-23 12:21:38
本公司施工管理的特点是“规划先行,示范引领的方式” ,该项目将按照规划编制计划,将制定详细的,有针对性和可行性施工方案,从而将在管理水平和操作实现
  • 匿名
2013-05-23 12:23:18
这么, 这样地   这; 今, 本; 这个
  • 匿名
2013-05-23 12:24:58
修建控制特征是“计划前进的这家公司,模型带领方式”,这个项目将顺从到计划创立计划,公式化详细,指向了和可行性建筑计划,因而体会在管理级别,并且操作水平对建筑工艺,质量规格知交和掌握,将造成项目有条不紊地修建保证自然准时完成。建筑计划覆盖面一定全面,内容一定是详细的,比赛由图表,丰富,并且典雅,生动地达到,图象,再分配行为操作水平研究建筑计划热情
  • 匿名
2013-05-23 12:26:38
这个公司构造控制特征是"计划的进展,该模型引领方式",这个项目将推迟到计划制定计划,将制定详细的我刚才和可行性建设计划,从而将实现在管理水平和操作水平施工工艺,质量规格熟悉和把握,将使项目建设有条不紊地保证自然要按时完成。施工计划覆盖范围必须是全面的必须对内容进行详细的配以图形、 丰富、 高雅,达到,形象生动,重新分配操作水平研究建设计划热情
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭