当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:1. accurate and reliable ground connection and zero connection to prevent omission.2. electrical equipment installation, maintenance and protection, strictly in accordance with the technical specifications for the safe use of electricity in construction site "implementation and operation.3. establishment of security in是什么意思?

待解决 悬赏分:1 - 离问题结束还有
1. accurate and reliable ground connection and zero connection to prevent omission.2. electrical equipment installation, maintenance and protection, strictly in accordance with the technical specifications for the safe use of electricity in construction site "implementation and operation.3. establishment of security in
问题补充:

  • 匿名
2013-05-23 12:21:38
1.准确而可靠的接地和接零,以防止omission.2。
  • 匿名
2013-05-23 12:23:18
正在翻译,请等待...
  • 匿名
2013-05-23 12:24:58
1. 准确和可靠的防止omission.2的地线连接和零的连接。 电机设备设施、维护和保护,严密地与技术规格符合为对电的安全使用在建造场所“实施和operation.3。 安全检查系统的创立。 常规检验电机工程,主要内容: 着陆抵抗,电机设备,绝缘电阻,漏出保护行动参量,临时电力工程控制是安全和可靠的,并且做检查records.4。 建立的电子修理系统。 加强每日维护和周期性修理工作,查出和消灭暗藏的危险和建立维护纪录,维护纪录,地点,设备,内容,技术,处理技术,维护人员,检查personnel.5。 取消系统建立了。 在项目的完成以后,取消临时电源应该组织和被指挥的和折除的时间、人员、规程、
  • 匿名
2013-05-23 12:26:38
1.准确、 可靠的接地和零连接,以防止 omission.2。电气设备的安装、 维护和保护,严格按照安全使用的电力建设中的技术规格网站"实施情况和 operation.3。建立安全检查制度。常规测试电气工程,主要研究内容: 接地电阻、 电气设备、 绝缘电阻、 漏电保护动作参数、 临时用电工程项目控制是安全、 可靠,和使检验 records.4。电器维修系统建立。加强日常维护保养和定期维修工作,发现和消除安全的隐患,并建立维修记录、 维修记录、 地点、 设备、 内容、 技术、 加工技术、 维修人员、 检验 personnel.5。拆卸系统成立。项目,完成拆除后临时电源应组织、 指导、 和拆除时间
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭