当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:The steel skeleton of the stone installation, is the main channel for vertical main keel, when installed, first in the main structure of the surface, horizontal 800mm, elastic vertical vertical line. Then channel arranged along the longitudinal vertical. After the arrangement is completed, both sides of the channel by 是什么意思?

待解决 悬赏分:1 - 离问题结束还有
The steel skeleton of the stone installation, is the main channel for vertical main keel, when installed, first in the main structure of the surface, horizontal 800mm, elastic vertical vertical line. Then channel arranged along the longitudinal vertical. After the arrangement is completed, both sides of the channel by
问题补充:

  • 匿名
2013-05-23 12:21:38
石安装的钢骨架,是主信道为垂直主龙骨,在安装时,首先在表面的主体结构,水平800毫米,弹性垂直的垂直线。
  • 匿名
2013-05-23 12:23:18
钢框架的安装的石头,一个主要通道,用于垂直主龙骨安装时,第一个在主结构的表面,水平800mm、弹性垂直竖线。 然后通道安排沿纵向垂直的。 在安排完成后,双方的渠道的垂直间距1500mm,确定固定点(扩展螺栓),和φ16电锤钻一个圆孔(固定∠50x50x5角),切割成100mm左和右上角接头。
  • 匿名
2013-05-23 12:24:58
石设施的钢骨骼,是主水道为垂直的主要船骨,当安装,首先在表面,水平800mm,有弹性垂直的垂直线的主要结构时。 然后渠道沿纵向垂直安排了。 在安排完成之后,渠道的双方由竖直间距1500mm,确定定象点 (伸缩栓),并且φ 16电锤钻子一个圆的孔 (固定了∠ 50x50x5角度),切开了成100mm左右弯管接头。 壁角连接的一与家的边与立式钻床钻子12.5圆的孔的与定点 (φ) 坚实点的伸缩栓设施和连接连接设施和焊接船骨。 主要船骨在设施以后,在石垂直的栅格大小在船骨、流行音乐平实船骨线,然后∠ 50x50x5角度酒吧的主要表面,和主要安装托梁设施和焊接有关
  • 匿名
2013-05-23 12:26:38
石材安装的钢骨架、 主要是采用槽钢作竖向主龙骨、 安装时、 先在主体结构表面、 按水平间距800mm、 弹纵向垂直线。然后将槽钢沿纵向垂线进行布置。布置完毕后,在槽钢两侧按竖向间距1500mm,确定固定点 (膨胀螺栓) 指出,并用电锤钻Φ16圆孔 (固定∠50 × 50 × 5角钢),切成100mm左右作角码连接件。在角码连接的一侧用台钻钻Φ12.5圆孔与固定点 (膨胀螺栓) 安装固点、 同时将连接件与主龙骨进行连接安装并焊接。待主龙骨安装完毕后、 按石材竖向分格尺寸在主龙骨表面、 弹出水平次龙骨定位线、 再将∠50 × 50 × 5角钢与主龙骨连接安装并焊接
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭