求翻译:Progress plan establishment: Always controls the plan take the project as the basis, the formulation by rank section time limit for a project control goal, like the basement structure completes control points and so on time, complete project completion time, guarantees the total time limit for a project through the con是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Progress plan establishment: Always controls the plan take the project as the basis, the formulation by rank section time limit for a project control goal, like the basement structure completes control points and so on time, complete project completion time, guarantees the total time limit for a project through the con
问题补充:

  • 匿名
2013-05-23 12:21:38
进度计划编制:总控计划以项目为基础,制定按等级段时间工期控制目标,像地下室结构完成控制点等的时间,完成项目的完成时间,确保总工期
  • 匿名
2013-05-23 12:23:18
促进, 进行, 进步   进步, 前进, 发展
  • 匿名
2013-05-23 12:24:58
进展计划创立: 总控制计划作为项目作为依据,公式化由茂盛的部分期限为一个项目控制目标,象地下室结构全面控制点等等时间,完全项目完成时间,保证总期限为一个项目通过控制分开计划。根据总控制计划,分开计划并且所有者另外时间到项目期限为项目请求,在正确的片刻拟定一个更加详细的月度计划,星期计划,每周检查,对比,分析,发现关键问题,保证同一个月计划有同一个月完成。 这个项目建筑进展计划包括设计,购买,制造,就职,设法移动,使等等再分配行为满意。整个项目建筑进展计划由三级计划形成,计划创立的所有水平在平实计划之上是依据,进步发射。三级建筑进展计划通过总进展计划、月计划和星期计划形式体现。
  • 匿名
2013-05-23 12:26:38
进度计划编制: 总是控制计划以项目为基础,制定项目控制的目标,如地下室结构完成控制点和等等的时候,完整的项目完成时间,保证项目通过控制分区计划确定的总工期的秩一节时间限制。根据总是控制计划、 分区计划,以及所有者不同时间到项目的时间限制为一个项目的请求,在适当的时刻制定更详细的月度计划、 周计划,每个星期内查阅、 对比、 分析,发现关键的问题,保证相同的月计划,有同一个月完成。 这个项目的施工进度计划,包括设计、 采购、 制造、 安装、 试图移动,内容和调任工作等等。整个项目施工进度计划由三级以上水平的方案计划编制各级计划编队是基础,逐步推出。三个水平的施工进度计划通过总进度计划、 月计划、