求翻译:P6 of the structural water impermeability grade. Foundation concrete cushion after the construction began along the basement Foundation slab laying around 120 thick red brick pattern, higher than the 50 mm on the surface on the floor. Inside the brick mold 1:2.5 15~20 thick cement mortar screed calendering, the roots l是什么意思?

待解决 悬赏分:1 - 离问题结束还有
P6 of the structural water impermeability grade. Foundation concrete cushion after the construction began along the basement Foundation slab laying around 120 thick red brick pattern, higher than the 50 mm on the surface on the floor. Inside the brick mold 1:2.5 15~20 thick cement mortar screed calendering, the roots l
问题补充:

  • 匿名
2013-05-23 12:21:38
正在翻译,请等待...
  • 匿名
2013-05-23 12:23:18
P6级结构水不渗透性。 基础混凝土垫后开始建设的地下室基础带周围铺设120厚红砖图案,高于50毫米的表面上的地板上。 砖模具内部的1:2.5 15厚水泥沙浆screed日历,根小花园旋转角度,半径r=50。
  • 匿名
2013-05-23 12:24:58
正在翻译,请等待...
  • 匿名
2013-05-23 12:26:38
结构水抗渗等级 P6。地基混凝土垫层施工开始沿着地下室底板铺设约 120 厚红砖图案,高于 50 毫米在地板上表面后。里面的砖模具增购 15 ~ 20 厚水泥砂浆找平层压延,根小园弧角,半径为 r = 50。防水施工技术交底,由特殊的指导和行动,要特别注意的是: 额外的层前必须做的薄弱部位的阴和阳,大面积施工的角度。线圈长度的垂直和水平重叠和错开的煤层,必须满足规定的宽度和牢固地粘贴。防水层施工完成,隐蔽检查验收时间油毡和 50 层厚厚的细石混凝土。根据头部的防水在接下来的程序建设正在销毁过程中,使用水泥砖保护。墙墙面防水的拆装,重点消除顶砖保护墙,要予以严肃处理防水连接器底部之后。防水、 特