求翻译:Floor steel construction process: verification templates elevation elastic reinforcement position → line → bottom layer of the reinforcing steel banding → → → placed blocks laying professional pipeline placed horse stool → reinforced → identifies top mat spacing lashing the upper steel → declare hidden inspection → vis是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Floor steel construction process: verification templates elevation elastic reinforcement position → line → bottom layer of the reinforcing steel banding → → → placed blocks laying professional pipeline placed horse stool → reinforced → identifies top mat spacing lashing the upper steel → declare hidden inspection → vis
问题补充:

  • 匿名
2013-05-23 12:21:38
楼钢结构施工工艺:验证模板海拔弹性补强的位置→线→钢筋绑扎底层→→→放置块铺设专业管道放在凳子马钢筋→确定→顶垫间距绑扎上部钢筋→隐藏申报→检验→签证
  • 匿名
2013-05-23 12:23:18
铺地板, 打倒   地板, 底部, 楼层
  • 匿名
2013-05-23 12:24:58
地板钢建筑过程: 证明模板海拔有弹性增强位置→线加强的钢条带→ → →被安置的块的→放置专业管道的底部层数安置了马凳子→被加强的→辨认抨击上部钢→的顶面席子间距宣称暗藏的检查→签证→暗藏的测试到下个做法。主场增强技术:铁棍直径地板平板是小的,增加铁栏杆没有偏折,间距是600mm的脚蹬,李子开花显示,保证鞋帮酒吧。在及时地抨击平板步行路的钢、架设防止操作建设中直接地在惊逃钢,钢的位移和变形以后。在倾吐的混凝土过程中,安排为联盟的钢铁工人当班,被发现的增强位移和变形修理,酒吧保留间距,地点,盖子符合设计要求,增强工程学质量管理图。
  • 匿名
2013-05-23 12:26:38
地板钢施工工艺: 验证模板高程弹性钢筋位置线 → 底部层钢筋的钢带放块放置的专业管道敷设 → → → 马凳钢筋 → 标识顶级垫间距绑扎上部钢 → 声明隐藏的 → 签证 → 隐藏的检验到下道工序。主要加固技术: 楼楼板的钢筋直径小,添加铁栏杆踏板间距是 600 毫米,梅花盛开显示,确保上部酒吧不偏转。后痛斥架设的行人路及时防止操作下建设直接对踩踏事件钢板坯钢钢的变形和位移。在混凝土浇注过程中安排值班,发现钢筋位移和变形修理,盟军钢铁工人保持间距的酒吧,位置,盖能满足设计要求,强化工程质量控制图。