求翻译:Steel loft by the project construction completion, project engineer responsible for auditing. Lofting personnel familiar with the design requirements and specifications, after carefully check drawings, reinforcement drawing detail drawing for each component, indicate the diameter, root number, quantity, component parts是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Steel loft by the project construction completion, project engineer responsible for auditing. Lofting personnel familiar with the design requirements and specifications, after carefully check drawings, reinforcement drawing detail drawing for each component, indicate the diameter, root number, quantity, component parts
问题补充:

  • 匿名
2013-05-23 12:21:38
钢铁阁楼由项目建设完成后,项目工程师负责审核。
  • 匿名
2013-05-23 12:23:18
钢杆面倾角的完成该项目建设,项目工程师负责审核。
  • 匿名
2013-05-23 12:24:58
钢顶楼由项目建筑完成,项目工程师负责任对验核。 Lofting人员熟悉设计要求和规格,在仔细地检查图画,增强图画细部图为每个组分,表明直径、根数字、数量、零件和相关考虑之后,审查由项目的总工程师。增强布局要求: 钢顶楼Lofting形式必须是准确,实时性,清楚和充分的考虑到至少削减。 为管理舒适,酒吧数字应该避免复制,并且应该是分开的由层数,组分和如此。 钢应该考虑制造长度弯曲的调整。
  • 匿名
2013-05-23 12:26:38
通过项目建设完成后,项目工程师负责审核的钢阁楼。放样人员熟悉的设计要求和规格后仔细检查图纸,配筋图纸绘制的每个组件的详细说明直径、 根数、 数量、 组成部件及相关考虑因素,,审查该项目的首席工程师。加固布局要求: 钢阁楼放样形式必须准确、 及时、 清楚,并充分考虑到至少削减。为易于管理、 条形号码应避免重复,而且应该被分开的层,组件,等等。应考虑弯曲调整钢结构制造长度。