求翻译:Design of construction joint: to ensure the template supporting the stability of the system, each floor columns, beams and slabs of concrete separated watering, water column, later casting slab. One-way slab located parallel to the short side at any point. Floor joist direction of the primary beam placement, design of 是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Design of construction joint: to ensure the template supporting the stability of the system, each floor columns, beams and slabs of concrete separated watering, water column, later casting slab. One-way slab located parallel to the short side at any point. Floor joist direction of the primary beam placement, design of
问题补充:

  • 匿名
2013-05-23 12:21:38
施工缝的设计:保证支撑系统的稳定性,每层柱,梁及混凝土分离浇水,水柱板坯,以后铸造板坯的模板。
  • 匿名
2013-05-23 12:23:18
设计的建设:要确保模板支撑系统的稳定,每一层楼柱、梁和水泥分隔令人垂涎三尺,水柱,后来转换带。 0路带位于平行于短边的任何点。 楼的方向轻钢桁架的主射束布局、设计的建设涵盖一个射束中的第三种。
  • 匿名
2013-05-23 12:24:58
建筑联接设计: 要保证支持系统的稳定的模板,每个地板专栏、混凝土射线和平板分离浇灌,水专栏,最新铸件平板。 单程平板找出平行对短的边任何点。 难倒主要射线安置的安装托梁方向,建筑联接设计在射线间距三分之一范围。 保持在地板上为台阶的第三步。建筑联接的治疗: 在设置和硬化具体表面在倾吐混凝土之前,您必须清除垃圾和水泥影片、表面宽松混凝土和沙子,残骸,并且应该也是切口头发,冲洗干净,并且应该清扫充分弄湿,在水面和废物。 在倾吐之前,应该用美好的石混凝土标号的10-15层数盖水平的建筑联接。 为了防止模板的漏出在水专栏,当具体建筑联接应该在模板之间和倾吐了具体压力洞穴状BA Zi焦灰浆或者外部。
  • 匿名
2013-05-23 12:26:38
施工缝的设计: 为了确保模板支撑系统的稳定性,每层柱、 梁、 板的混凝土分离浇水,水柱,后来连铸坯。单向板位于任何点的短边平行。地板梁方向的主梁位置,施工缝在梁的设计有三分之一范围。仍然在地上为楼梯的第三步。施工缝处理: 在设置和硬化的混凝土表面在浇筑混凝土之前,你必须清除垃圾、 水泥薄膜,表面的松散混凝土和砂、 碎片、 和应该也是剪头发,冲洗干净并充分湿润,地表水中和废物应清理。浇筑、 水平施工前接头应满 10-15 层的细石混凝土标号。为了防止泄漏在水柱时混凝土施工缝应之间的模板和已浇混凝土压力海绵状的八字角砂浆或外部的模板。