求翻译:Template removal one-time in place, leaving no demolition, especially vacant template. The construction template must first check the removal, then the scheme of chief engineer of the project approval, after stripping to. Formwork completely by the construction, quality and safety inspector acceptance, production deput是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Template removal one-time in place, leaving no demolition, especially vacant template. The construction template must first check the removal, then the scheme of chief engineer of the project approval, after stripping to. Formwork completely by the construction, quality and safety inspector acceptance, production deput
问题补充:

  • 匿名
2013-05-23 12:21:38
模板拆除一次性到位,不留拆迁,尤其是空置的模板。
  • 匿名
2013-05-23 12:23:18
模板删除一次性到位,不留任何拆卸、特别是空置模板。 建筑模板必须先检查,然后再计划的首席工程师的项目审批,在剥皮。 模板完全由建设、质量和安全督察验收、生产副项目经理进行定期检查,对不合格的验收、安全风险存在,必须彻底纠正。
  • 匿名
2013-05-23 12:24:58
模板撤除一次性到位,留下爆破,特别是空置模板。 建筑模板必须首先检查撤除,然后计划项目认同的总工程师,在剥离以后。 完全模板由建筑、质量和安全审查员采纳,生产代理项目负责人品行正规兵检查,在采纳不够资格,安全风险存在,必须是详尽的整流。 模板采纳必须清楚地指定地点、采纳的数字,类型的模板,采纳、日期等等。 必须由队做模板,建筑到详细的安全技术阐明,并且创造透露纪录。
  • 匿名
2013-05-23 12:26:38
模板拆除一次性到位,离开没有拆除,尤其是空置的模板。建筑模板必须首先检查去除,然后总工程师项目审批后到汽提, 的方案。模板完全由建设质量和安全督察验收、 生产副项目经理进行定期检查,验收不合格,安全风险的存在,必须进行彻底的整顿。模板验收必须明确指定位置、 接受数目、 模板的类型、 验收、 日期等......模板,施工必须由团队到详尽的安全技术交底,并进行披露纪录。
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 