当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:Cause: watering large areas and large volume reinforced concrete structures, often layered construction, construction ceased during the very wood, sawdust and other debris (in winter there is snow, ice) product of concrete surface, debris such as check clearing, when pouring concrete again, was wedged into the concrete是什么意思?

待解决 悬赏分:1 - 离问题结束还有
Cause: watering large areas and large volume reinforced concrete structures, often layered construction, construction ceased during the very wood, sawdust and other debris (in winter there is snow, ice) product of concrete surface, debris such as check clearing, when pouring concrete again, was wedged into the concrete
问题补充:

  • 匿名
2013-05-23 12:21:38
原因:浇灌大面积和大体积钢筋混凝土结构,经常分层结构,非常木施工停止,木屑等杂物(冬季有雪,冰)混凝土表面的产品,杂物如支票结算,浇筑混凝土时,
  • 匿名
2013-05-23 12:23:18
正在翻译,请等待...
  • 匿名
2013-05-23 12:24:58
起因: 浇灌大区域和大容量的钢筋混凝土结构、经常层状在木头期间停止的建筑、建筑,锯木屑和其他残骸 (在那里冬天是雪,具体) 表面,残骸冰产品例如检查清洁,当再时倾吐混凝土,被楔住了入具体,导致残骸在建筑联接“三明治”。防备措施: 在倾吐混凝土之前检查和清扫残骸在表面,啤牌开放在模板与建筑联接一起,清扫冬天与冻雪,使用太阳灯和其他烤权利,清洗,如果锯木屑和仅其他残骸,吹风机可以使用,例如吹动,所有在清洗的,清洗的标尺开头关闭板材和混凝土以后
  • 匿名
2013-05-23 12:26:38
原因: 经常浇水大面积和大体积钢筋混凝土结构,分层施工,施工期间非常的木头、 木屑和其他碎片 (在冬天有雪,冰) 停止产品的混凝土表面,如支票结算,当再次,浇筑混凝土碎片被挤入混凝土,导致碎片,施工缝处"夹心"。预防措施: 浇筑混凝土前检查并清理表面上看,扑克打开模板以及施工缝在碎片清理冻雪的冬天使用太阳灯具和其他烤好,清洁如果只有木屑和其他杂物,风机可以使用,如打击,全部经过清洗,清洗杆打开封闭板与混凝土
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭