求翻译:) in the pump outlet is equipped with 3 root vibration tamping rod, were on a slope, and lower ends and vibrating, so that the natural flow of the concrete, then a comprehensive vibration, and strictly control the vibration time, moving distance, insertion depth, especially in slope bottom and edge horn to strengthen v是什么意思?

待解决 悬赏分:1 - 离问题结束还有
) in the pump outlet is equipped with 3 root vibration tamping rod, were on a slope, and lower ends and vibrating, so that the natural flow of the concrete, then a comprehensive vibration, and strictly control the vibration time, moving distance, insertion depth, especially in slope bottom and edge horn to strengthen v
问题补充:

  • 匿名
2013-05-23 12:21:38
)在泵出口配备3根振动捣固杆,分别在一个斜坡,和下端和振动,从而使混凝土,然后再全面振动的自然流动,严格控制的振动时间,移动距离,插入
  • 匿名
2013-05-23 12:23:18
)在油泵出油口配有3根振动夯实压路杆上,在一个斜坡上,和低端和振动,因此,自然流量的具体的,然后一个全面震动,并严格控制振动时间、移动距离,插入深度,特别是在斜坡底部和边缘按响喇叭,加强振动,请注意是否有漏水的振动。
  • 匿名
2013-05-23 12:24:58
) 在泵浦出口装备3根振动填塞标尺,在倾斜和末端和振动,因此具体,然后全面振动的自然流程和严密地控制振动时间,移动的距离,插入深度,特别是在倾斜底部,并且加强振动的边缘垫铁,当心振动漏出。 在振动以后,具体工作者在海拔对具体表面leveling.6) 具体倾吐大约1个小时,与长的抓痕脚刮的,木修平刀摩擦和按,在覆盖物维护的最后的设置以后捉住灵菌表面。
  • 匿名
2013-05-23 12:26:38
) 在泵出油口配有 3 根振动夯杆,是上一个斜坡,和低两端和振动,因此自然流动的混凝土,然后全面的振动,并严格控制振动时间、 移动距离,插入深度,尤其是在边坡底部和边角,以加强振动,谨防漏振。后振动,对混凝土标高的混凝土工人表面 leveling.6) 混凝土浇筑约 1 小时,用长刮尺刮平,木抹子揉和紧迫,赶上出血表面后覆盖维护的最终设置。
  • 匿名
2013-05-23 12:28:18
正在翻译,请等待...
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭