求翻译:1) in front of a wall of concrete pouring, it should be in the new pouring concrete and the lower concrete connect Cha place pouring approx. 50 mm thickness and wall concrete mix the same no stones of cement mortar.(2) the concrete layered pouring vibration, each layer of pouring thickness control at about 35 cm, pouri是什么意思?

待解决 悬赏分:1 - 离问题结束还有
1) in front of a wall of concrete pouring, it should be in the new pouring concrete and the lower concrete connect Cha place pouring approx. 50 mm thickness and wall concrete mix the same no stones of cement mortar.(2) the concrete layered pouring vibration, each layer of pouring thickness control at about 35 cm, pouri
问题补充:

  • 匿名
2013-05-23 12:21:38
1)在一个壁混凝土浇筑的前面,它应该在新浇混凝土和下部混凝土连接查地方倾倒大约
  • 匿名
2013-05-23 12:23:18
1)在一堵墙前的具体投入,它应当在新浇混凝土和较低的具体连接车将投入约
  • 匿名
2013-05-23 12:24:58
1) 在墙壁具体倾吐前面,它应该在新的倾吐的混凝土,并且更低的混凝土连接Cha地方大约倾吐。 50毫米厚度和墙壁混凝土混合料同样没有石头水泥灰浆。(2) 具体层状倾吐的振动,倾吐的厚度控制每层数在大约35 cm,倾吐的墙壁混凝土应该是连续的,间隔时间时间不可能超出最后的具体时间。(3) ,当具体在入口对入口对门,混凝土将对称地被安置在双方之下,并且振动的标尺同时同时振动,并且振动的标尺少于50毫米将是15 ~ 20 cm从() 孔。4,当墙壁混凝土振动,振动标尺的深度不是,和 振动的标尺的移动的距离少于7不少于13天和(夜) 天地下室外墙不可能是超过370毫米。5墙壁在具体倾吐(,) 上部开头
  • 匿名
2013-05-23 12:26:38
1) 前面的一堵墙的混凝土浇筑,它应在新浇混凝土与下层混凝土连接岔的地方浇大约 50 毫米厚度和墙混凝土的配合比相同的水泥砂浆没有石头。(2) 混凝土分层浇筑振动,每层浇筑厚度控制在 35 厘米左右,浇注墙混凝土应连续,间隔时间不能超过最后的具体时间。(3) 当混凝土的入口门入口处,混凝土应根据双方,对称放和振动棒同时振动同时,振动杆须为 15 ~ 20 厘米,从洞里。(4) 当墙混凝土是振动,振动棒的深度是不小于 50 毫米,和振动棒的移动距离可以不超过 370 mm.(5) 墙混凝土后浇了一瓢,上口,施工缝的钢被清除。(6) 除应及时用水固化后,应不小于 7 天 (不小于 13 白天和夜晚