当前位置:首页 » 翻译 
  • 匿名
关注:1 2013-05-23 12:21

求翻译:A. before the construction to complete axis retest, familiar with the drawing plan to do the construction layout, good construction section, arrange the construction of water, working procedure cross connection arrangement.B. the preparation of engineering materials, machinery, labor demand plan.C. witness sampling, in是什么意思?

待解决 悬赏分:1 - 离问题结束还有
A. before the construction to complete axis retest, familiar with the drawing plan to do the construction layout, good construction section, arrange the construction of water, working procedure cross connection arrangement.B. the preparation of engineering materials, machinery, labor demand plan.C. witness sampling, in
问题补充:

  • 匿名
2013-05-23 12:21:38
A.施工前完成复测轴,熟悉图纸计划做建筑的布局,良好的施工段,安排水利建设,工序交叉连接arrangement.B 。
  • 匿名
2013-05-23 12:23:18
A.
  • 匿名
2013-05-23 12:24:58
A. 在完成轴重测的建筑,熟悉图画计划做建筑布局,好建筑部分,安排水的建筑之前,办理手续十字架连接安排。B. 工程学材料的准备,机械,劳工需求计划。C. 目击采样、检查和石工灰浆材料的测试和发行。D. 轴和墙壁身体线、打开定位线的弹出式窗口和门根据实际尺寸的块词条必须体验线符合设计要求,罐头通过起飞前的形式
  • 匿名
2013-05-23 12:26:38
A.施工完成轴重测信度,熟悉绘图计划要做的建设布局、 良好的施工段,安排建设的水前, 工序交叉连接排列。B.编制工程材料、 机械、 劳动力需求计划。C.见证取样、 检验和砌体砂浆试验及分发材料。D.轴和墙体线、 弹出窗口和门线块条目的实际大小的位置必须经验线符合设计要求,可以通过印前检查手续
  • 匿名
2013-05-23 12:28:18
A. 完成轴的建造重新测试之前,熟悉素描计划做建造布局,好的建造部分,安排水的建造,操纵程序十字形连接 arrangement.B. 设计材料的筹备,机器,劳动需求 plan.C. 证人采样,检验, materials.D. 轴和墙身体线的石工臼测试和分配,根据实际大小的块输入打开位置的线的弹出式窗口和门必须经历线符合设计要求,可以通过起飞前的礼节
 
 
网站首页

湖北省互联网违法和不良信息举报平台 | 网上有害信息举报专区 | 电信诈骗举报专区 | 涉历史虚无主义有害信息举报专区 | 涉企侵权举报专区

 
关 闭